Desktop app · Early access

Write it down.
Link it
Map it.

DevBoard is a native desktop app for writers, worldbuilders, and solo makers. Notes that link to each other, and a canvas to see how they fit, all without leaving your computer.

Early access — expect rough edges. Send feedback.

How it works

Move from loose thought to visible system

DevBoard keeps notes, maps, and references in one local-first workspace, so you can change modes without losing the thread.

Markdown note Saved locally
A DevBoard note in split view, with its Markdown source beside the formatted preview
Markdown Favorites Focus mode Quick switcher

Why DevBoard

More than a notepad. Less fuss than a system.

How it compares
DevBoard Best fit
A notes file eg. Apple Notes
Obsidian Linked notes
Notion Full workspace
Quick notes without an account
✓
✓
✓
Account
Works offline with local files
✓
✓
✓
-
A visual board beside your notes
✓
-
Plugin
Limited
Easy links between related ideas
✓
-
✓
Some
Simple enough to just start writing
✓
✓
Powerful
-

The usual choice is a quick note file or a full workspace. DevBoard sits in the middle.

A notes file

Fast to start

Hits a ceiling when ideas need to connect.

A project workspace

Powerful once set up

Often more system than the task needed.

DevBoard Best fit

Structure on demand.

Write quickly. Link ideas when they connect. Open the canvas when a thought needs more room.


Optional sync

Local-first by default. Sync when you need it.

DevBoard works without an account. Cloud sync is a convenience layer for backup, multi-device access, and selected workspaces — not a requirement.

Free / Local

€0

For private, offline workspaces stored in a folder you control.

  • Unlimited local workspaces
  • Markdown notes and canvas pages
  • Export to Markdown, JSON, and PNG
  • Local workspaces stay free
  • No account required

Start with one note.

Early access is live for macOS, Windows & Linux. Free forever, no account required. A browser version is also available.